A number of EPA Guidances and technical papers are relevant to better understanding the expectations and issues surrounding Class 2 injection. Bold descriptors indicate most relevant documents.
Guidance 14 -- Memorandum of Agreement for the Underground Injection Control (UIC) Program
Guidance 18 -- Definition of a Major Facility
Guidance 19 -- Guidance for State Submissions Under Section 1425 of SDWA
Guidance 25 -- Casing and Cementing Requirements for Existing Class 2 Wells
Guidance 26 -- Five-Year Review of Class 2 and Class 3 Permits
Guidance 34 -- Guidance for Review and Approval of State UIC Programs and Revisions to Approved State Programs
Guidance 37 -- Maximum Injection Pressure Requirements for Class 2 Enhanced Recovery Wells and Wells Disposing of Produced Brines
Guidance 42 -- UIC Grant Guidance, FY 1986
Guidance 58 -- Procedure for Interpreting Whether or Not a MIT Failure or Excess Injection Pressure Is Reported as Significant Non-Compliance
Guidance 61 -- Justifying Alternative Methods to Prove Mechanical Integrity Pursuant to 40 CFR Section 146.8(d)
Guidance 64 -- Annual Compliance Review of Wells Permitted or Authorized by Rule under the UIC Program
Guidance 65 -- Guidance for Financial Responsibility in Federally-Administered UIC Class 2 Programs
Guidance 67 -- Revised Owner/Operator Handbook for Class 2 Financial Responsibility Demonstrations
Guidance 76 -- Follow-up to Loss of Mechanical Integrity in Class 2 Wells
Guidance 77 -- Operating, Monitoring, and Reporting Guidelines for Class 2D Commercial Salt Water Disposal Wells
Guidance for Determining Adequacy of State Underground Injection (UIC) Program Elements (1982)
Report -- Mechanical Integrity Testing of Injection Wells (1980)
Technical Program Overview: Underground Injection Control Regulations
National UIC Technical Workgroup #6 -- Cementing Records Requirements in Direct Implementation Programs to Achieve Part II of Mechanical Integrity of Class 2 Injection Wells
National UIC Technical Workgroup #8 -- Does a Fixed Radius Area of Review Meet the Statutory Mandate and Regulatory Requirements of Being Protective of USDWs Under 40 CFR 144.12?
National UIC Technical Workgroup -- Injection Well Plugging and Abandonment Checklist
Background Documents
Current Federal and State Laws
Historic State Laws and Regulations
Relevant EPA Guidance for UIC and Class 2 Injection
State Online Oil and Gas Databases
Technical Background, Seismicity, and Groundwater Contamination
Underground Injection Control Class 2 Wells
Introduction to Class 2 Wells in West Virginia
Collected documents and information for a number of Class 2 disposal wells and secondary recovery area permits
Searchable tables for UIC inspections, UIC permitting and MITs based on a copy of the Office of Oil and Gas' online UIC databases made in 2016.
Select wells which present important issues
A UIC well constructed without any cement behind the steel casing strings to protect groundwater.
A commercial UIC well where activity on the site contaminated groundwater.