In August 2016 we copied a large portion of the Office of Oil and Gas online database for Mechanical Integrity Tests. This database is no longer available online so we are presenting our copy here.
This MIT database copy needs to be used with caution. There are errors sometimes in the databases. We copied databases by county and didn't copy all the counties with UIC wells. Just because a well doesn't appear on the database copy, doesn't mean that information wasn't available at that time. This table includes data for disposal and secondary recovery wells.
Wells are identified by API number in an abbreviated form (without the state, 47-, prefix). The table is searchable by API number (in part or whole) or any other sequence of letters or numbers.
API | MIT Test Date | MIT Test | Comments | 001-00561 | 12/10/2012 | Annulus pressure passed |
---|---|---|---|
001-00561 | 10/29/2012 | Annulus pressure passed | |
001-00561 | 10/8/2012 | Casing/tubing pressure passed | |
001-00561 | 10/27/2011 | Annulus pressure passed | |
001-00777 | 4/21/1993 | Casing/tubing pressure passed | |
015-00051 | 1/28/1994 | Casing/tubing pressure passed | |
015-00095 | 4/17/1995 | Casing/tubing pressure passed | |
015-00698 | 10/28/2011 | Annulus pressure passed | |
015-00698 | 9/4/2008 | Casing/tubing pressure passed | |
015-00698 | 3/2/1993 | Casing/tubing pressure passed | |
015-00867 | 2/26/1993 | Casing/tubing pressure passed | |
015-00874 | 8/11/1995 | Other passed | |
015-00883 | 3/26/1993 | Casing/tubing pressure passed | |
015-00892 | 1/13/1994 | Casing/tubing pressure passed | |
015-00899 | 9/16/1992 | Casing/tubing pressure passed | |
015-00899 | 9/11/1992 | Casing/tubing pressure failed | |
015-00926 | 8/25/1999 | Other passed | |
015-00933 | 7/22/1999 | Other passed | |
015-00933 | 4/16/1992 | Annulus pressure passed | |
015-00943 | 8/25/1999 | Other passed | |
015-01017 | 3/24/2014 | Annulus method passed | |
015-01017 | 12/15/2008 | Annulus method passed | |
015-01017 | 6/7/1998 | Casing/tubing pressure passed | |
015-01017 | 10/10/1996 | Casing/tubing pressure passed | |
015-01107 | 9/23/2008 | Casing/tubing pressure passed | |
015-01107 | 8/11/1994 | Casing/tubing pressure passed | |
015-01109 | 9/24/1993 | Casing/tubing pressure passed | |
015-01128 | 9/18/2008 | Casing/tubing pressure passed | |
015-01128 | 8/9/1995 | Other passed | |
015-01132 | 9/19/2014 | Annulus method passed | |
015-01132 | 8/13/2008 | Casing/tubing pressure passed | |
015-01132 | 8/11/1994 | Casing/tubing pressure passed | |
015-01133 | 6/6/2011 | Annulus method passed | |
015-01166 | 8/10/2011 | Annulus method passed | |
015-01166 | 9/12/1998 | Other passed | |
015-01170 | 8/10/2011 | Annulus method passed | |
015-01170 | 7/22/1999 | Other passed | |
015-01172 | 8/3/1999 | Other passed | |
015-01172 | 8/2/1999 | Annulus method passed | |
015-01173 | 8/14/1998 | Casing/tubing pressure passed | |
015-01173 | 2/27/1992 | Casing/tubing pressure passed | |
015-01173 | 2/7/1992 | Annulus pressure failed | |
015-01174 | 9/16/1997 | Casing/tubing pressure passed | |
015-01176 | 8/3/1999 | Annulus method passed | |
015-01177 | 8/3/1999 | Annulus method passed | |
015-01184 | 9/1/1999 | Other passed | |
015-01185 | 10/16/1997 | Casing/tubing pressure passed | |
015-01187 | 10/28/2011 | Annulus pressure passed | |
015-01187 | 7/15/1999 | Other passed | |
015-01188 | 7/21/2011 | Annulus method passed | |
015-01188 | 7/15/1999 | Other passed | |
015-01190 | 8/30/2011 | Annulus method passed | |
015-01190 | 7/22/1999 | Other passed | |
015-01198 | 12/8/1993 | Casing/tubing pressure passed | |
015-01219 | 7/27/1999 | Other passed | |
015-01220 | 8/4/1999 | Other passed | |
015-01221 | 8/25/1999 | Other passed | |
015-01223 | 7/15/1999 | Other passed | |
015-01226 | 9/8/2011 | Casing/tubing pressure passed | |
015-01226 | 7/22/1999 | Other passed | |
015-01227 | 7/22/1999 | Other passed | |
015-01239 | 11/17/2011 | Annulus pressure passed | |
015-01239 | 8/4/1999 | Other passed | |
015-01241 | 7/27/1999 | Other passed | |
015-01242 | 10/28/2011 | Annulus pressure passed | |
015-01242 | 8/4/1999 | Other passed | |
015-01243 | 8/30/2011 | Annulus method passed | |
015-01243 | 8/4/1999 | Other passed | |
015-01249 | 7/27/1999 | Other passed | |
015-01250 | 4/13/1995 | Casing/tubing pressure passed | |
015-01250 | 10/25/1994 | Annulus pressure failed | |
015-01250 | 4/15/1994 | Casing/tubing pressure passed | |
015-01251 | 7/22/1999 | Other passed | |
015-01273 | 7/15/1999 | Other passed | |
015-01306 | 5/21/1999 | Other passed | |
015-01307 | 8/4/1999 | Other passed | |
015-01310 | 5/19/1999 | Other passed | |
015-01429 | 7/22/1999 | Other passed | |
015-01468 | 9/2/1998 | Casing/tubing pressure passed | |
015-01468 | 2/15/1993 | Casing/tubing pressure passed | |
015-01483 | 9/9/1998 | Casing/tubing pressure passed | |
015-01485 | 9/12/1998 | Other passed | |
015-01507 | 7/27/1999 | Other passed | |
015-01507 | 5/17/1996 | Annulus pressure failed | |
015-01591 | 7/27/1999 | Other passed | |
015-01592 | 8/3/1999 | Other passed | |
015-01593 | 7/27/1999 | Other passed | |
015-01593 | 5/11/1994 | Casing/tubing pressure passed | |
015-01593 | 4/13/1994 | Annulus pressure failed | |
015-01593 | 3/24/1994 | Annulus pressure failed | |
015-01594 | 7/27/1999 | Other passed | |
015-01594 | 3/24/1994 | Annulus pressure failed | |
015-01596 | 8/24/1998 | Casing/tubing pressure passed | |
015-01596 | 2/12/1993 | Casing/tubing pressure passed | |
015-01596 | 10/4/1992 | Annulus pressure failed | |
015-01597 | 8/3/1999 | Other passed | |
015-01601 | 3/21/2012 | Annulus pressure passed | |
015-01602 | 2/7/2012 | Casing/tubing pressure passed | |
015-01602 | 8/5/1999 | Other passed | |
015-01603 | 2/21/2012 | Casing/tubing pressure passed | |
015-01603 | 9/18/1998 | Other passed | |
015-01621 | 9/24/1997 | Casing/tubing pressure passed | |
015-01626 | 8/5/1999 | Other passed | |
015-01626 | 4/16/1992 | Annulus pressure passed | |
015-01630 | 8/3/1999 | Other passed | |
015-01630 | 4/16/1992 | Annulus pressure passed | |
015-01641 | 8/28/1998 | Casing/tubing pressure passed | |
015-01641 | 3/12/1992 | Casing/tubing pressure passed | |
015-01641 | 2/28/1992 | Annulus pressure failed | |
015-01642 | 9/22/1992 | Casing/tubing pressure passed | |
015-01642 | 6/2/1992 | Casing/tubing pressure passed | |
015-01643 | 1/6/1998 | Casing/tubing pressure passed | |
015-01644 | 7/22/1999 | Other passed | |
015-01649 | 9/19/1997 | Casing/tubing pressure passed | |
015-01651 | 8/5/1999 | Other passed | |
015-01652 | 7/27/1999 | Other passed | |
015-01653 | 7/22/1999 | Other passed | |
015-01654 | 8/4/1999 | Other passed | |
015-01655 | 9/17/1997 | Casing/tubing pressure passed | |
015-01721 | 7/22/1999 | Other passed | |
015-01722 | 7/22/1999 | Other passed | |
015-01723 | 7/22/1999 | Other passed | |
015-01724 | 7/22/1999 | Other passed | |
015-01724 | 3/10/1994 | Casing/tubing pressure passed | |
015-01725 | 7/22/1999 | Other passed | |
015-01726 | 7/22/1999 | Other passed | |
015-01727 | 7/22/1999 | Other passed | |
015-01728 | 7/22/1999 | Other passed | |
015-01728 | 4/16/1992 | Annulus pressure passed | |
015-01783 | 7/8/2010 | Casing/tubing pressure passed | |
015-01783 | 10/28/1997 | Casing/tubing pressure passed | |
015-01784 | 10/27/1997 | Casing/tubing pressure passed | |
015-01793 | 9/8/2011 | Casing/tubing pressure passed | |
015-01793 | 1/20/1998 | Casing/tubing pressure passed | |
015-01817 | 8/3/1999 | Other passed | |
015-01818 | 8/5/1999 | Other passed | |
015-01818 | 5/6/1992 | Casing/tubing pressure passed | |
015-01819 | 8/5/1999 | Other passed | |
015-01819 | 5/15/1992 | Casing/tubing pressure passed | |
015-01820 | 8/3/1999 | Other passed | |
015-01820 | 5/5/1992 | Casing/tubing pressure passed | |
015-01821 | 11/21/2011 | Annulus pressure passed | |
015-01821 | 9/18/1997 | Other passed | |
015-01823 | 8/21/1997 | Casing/tubing pressure passed | |
015-01824 | 9/2/1997 | Casing/tubing pressure passed | |
015-01932 | 8/27/2014 | Casing/tubing pressure passed | |
015-01932 | 8/10/1995 | Other passed | |
015-01933 | 8/11/1995 | Other passed | |
015-01934 | 11/20/1997 | Casing/tubing pressure passed | |
015-01934 | 2/25/1992 | Annulus pressure passed | |
015-01935 | 8/11/1995 | Other passed | |
015-01936 | 8/11/1995 | Other passed | |
015-01937 | 10/2/2012 | Annulus pressure passed | |
015-01937 | 8/11/1995 | Other passed | |
015-01941 | 8/11/1995 | Other passed | |
015-01942 | 8/11/1995 | Other passed | |
015-01943 | 9/8/1997 | Casing/tubing pressure passed | |
015-01951 | 8/11/1995 | Other passed | |
015-01952 | 8/10/1995 | Other passed | |
015-01953 | 6/23/2011 | Annulus method passed | |
015-01953 | 7/26/1995 | Other passed | |
015-01954 | 8/10/1995 | Other passed | |
015-01955 | 8/10/1995 | Other passed | |
015-01956 | 8/10/1995 | Other passed | |
015-01958 | 8/11/1995 | Other passed | |
015-01959 | 10/3/2012 | Annulus pressure passed | |
015-01959 | 8/11/1995 | Other passed | |
015-01960 | 8/10/1995 | Other passed | |
015-02001 | 8/5/1999 | Other passed | |
015-02002 | 8/29/1997 | Casing/tubing pressure passed | |
015-02024 | 8/2/1995 | Casing/tubing pressure passed | |
015-02121 | 11/12/2008 | Casing/tubing pressure passed | |
015-02121 | 8/10/1995 | Other passed | |
015-02122 | 8/8/1995 | Casing/tubing pressure passed | |
015-02124 | 7/27/1995 | Casing/tubing pressure passed | |
015-02125 | 10/5/2012 | Annulus pressure passed | |
015-02125 | 8/10/1995 | Other passed | |
015-02130 | 9/19/2014 | Annulus pressure passed | |
015-02130 | 10/1/2008 | Casing/tubing pressure passed | |
015-02130 | 8/11/1995 | Other passed | |
015-02131 | 9/19/2014 | Annulus method passed | |
015-02131 | 10/15/2008 | Casing/tubing pressure passed | |
015-02131 | 8/1/1995 | Casing/tubing pressure passed | |
015-02132 | 11/4/2008 | Casing/tubing pressure passed | |
015-02132 | 7/28/1995 | Casing/tubing pressure passed | |
015-02133 | 9/10/2014 | Annulus method passed | |
015-02133 | 10/28/2008 | Annulus method passed | |
015-02133 | 7/31/1995 | Casing/tubing pressure passed | |
015-02134 | 11/10/2008 | Casing/tubing pressure passed | |
015-02134 | 8/7/1995 | Casing/tubing pressure passed | |
015-02135 | 8/10/1995 | Other passed | |
015-02136 | 8/11/1995 | Other passed | |
015-02137 | 8/10/1995 | Other passed | |
015-02138 | 7/27/1995 | Casing/tubing pressure passed | |
015-02139 | 9/8/2014 | Annulus method passed | |
015-02139 | 7/26/1995 | Casing/tubing pressure passed | |
015-02140 | 11/19/1997 | Casing/tubing pressure passed | |
015-02140 | 2/25/1992 | Annulus pressure passed | |
015-02141 | 7/26/1995 | Casing/tubing pressure passed | |
015-02145 | 10/7/2008 | Casing/tubing pressure passed | |
015-02145 | 8/14/1995 | Other passed | |
015-02146 | 9/8/2014 | Annulus method passed | |
015-02146 | 10/3/2008 | Casing/tubing pressure passed | |
015-02146 | 8/10/1995 | Other passed | |
015-02147 | 8/11/1995 | Other passed | |
015-02148 | 12/20/2008 | Casing/tubing pressure passed | |
015-02148 | 8/10/1995 | Other passed | |
015-02149 | 10/22/2008 | Casing/tubing pressure passed | |
015-02149 | 8/1/1995 | Casing/tubing pressure passed | |
015-02150 | 10/24/2008 | Casing/tubing pressure passed | |
015-02150 | 8/1/1995 | Casing/tubing pressure passed | |
015-02151 | 9/10/2014 | Annulus method passed | |
015-02151 | 10/30/2008 | Casing/tubing pressure passed | |
015-02151 | 8/11/1995 | Other passed | |
015-02157 | 7/28/1995 | Casing/tubing pressure passed | |
015-02158 | 8/27/2014 | Casing/tubing pressure passed | |
015-02158 | 8/3/1995 | Casing/tubing pressure passed | |
015-02159 | 8/11/1995 | Other passed | |
015-02167 | 10/17/2008 | Casing/tubing pressure passed | |
015-02167 | 8/11/1995 | Other passed | |
015-02168 | 12/9/2011 | Casing/tubing pressure passed | |
015-02168 | 1/25/1994 | Casing/tubing pressure passed | |
015-02213 | 12/2/2008 | Casing/tubing pressure passed | |
015-02213 | 8/9/1994 | Casing/tubing pressure passed | |
015-02214 | 7/21/2008 | Casing/tubing pressure passed | |
015-02214 | 8/10/1994 | Casing/tubing pressure passed | |
015-02215 | 7/23/2008 | Annulus pressure passed | |
015-02215 | 8/9/1994 | Casing/tubing pressure passed | |
015-02216 | 8/9/1994 | Casing/tubing pressure passed | |
015-02217 | 8/11/2008 | Casing/tubing pressure passed | |
015-02217 | 8/9/1994 | Casing/tubing pressure passed | |
015-02218 | 8/18/2008 | Casing/tubing pressure passed | |
015-02218 | 8/11/1994 | Casing/tubing pressure passed | |
015-02219 | 8/20/2008 | Casing/tubing pressure passed | |
015-02219 | 8/10/1994 | Casing/tubing pressure passed | |
015-02220 | 8/4/2008 | Casing/tubing pressure passed | |
015-02220 | 8/9/1994 | Casing/tubing pressure passed | |
015-02224 | 7/28/2008 | Casing/tubing pressure passed | |
015-02224 | 8/8/1994 | Casing/tubing pressure passed | |
015-02225 | 8/26/2008 | Casing/tubing pressure passed | |
015-02225 | 8/11/1995 | Other passed | |
015-02226 | 2/21/2012 | Casing/tubing pressure passed | |
015-02226 | 8/11/1994 | Casing/tubing pressure passed | |
015-02227 | 9/19/2014 | Other failed | |
015-02227 | 7/16/2008 | Casing/tubing pressure passed | |
015-02227 | 8/12/1994 | Casing/tubing pressure passed | |
015-02230 | 8/11/1994 | Casing/tubing pressure passed | |
015-02231 | 8/11/1994 | Casing/tubing pressure passed | |
015-02237 | 1/29/2015 | Annulus method failed | casing head leaked, retest continued to lose pressure, 1655 dropped to 1540 in 25 minutes |
015-02237 | 8/6/2008 | Casing/tubing pressure passed | |
015-02237 | 8/8/1994 | Casing/tubing pressure passed | |
015-02253 | 9/11/1997 | Other passed | |
015-02255 | 7/22/1999 | Other passed | |
015-02255 | 6/3/1992 | Casing/tubing pressure passed | |
015-02255 | 5/7/1992 | Casing/tubing pressure failed | |
015-02298 | 7/21/2011 | Annulus pressure passed | |
015-02298 | 10/30/1996 | Casing/tubing pressure passed | |
015-02299 | 9/25/1996 | Casing/tubing pressure passed | |
015-02300 | 9/20/1996 | Casing/tubing pressure passed | |
015-02301 | 9/26/1996 | Casing/tubing pressure passed | |
015-02302 | 7/27/1999 | Other passed | |
015-02303 | 11/17/2011 | Annulus pressure passed | |
015-02303 | 9/11/1996 | Casing/tubing pressure passed | |
015-02428 | 8/27/2014 | Casing/tubing pressure passed | |
015-02428 | 8/3/1999 | Other passed | |
015-02428 | 10/30/1993 | Annulus pressure passed | |
015-02430 | 7/22/1999 | Other passed | |
015-02430 | 10/27/1993 | Annulus pressure passed | |
015-02431 | 7/15/1999 | Other passed | |
015-02431 | 10/27/1993 | Annulus pressure passed | |
015-02432 | 7/27/1999 | Other passed | |
015-02432 | 10/30/1993 | Annulus pressure passed | |
015-02472 | 7/14/1994 | Other passed | |
015-02473 | 7/19/1994 | Other passed | |
015-02474 | 7/14/1994 | Other passed | |
015-02475 | 7/22/1999 | Other passed | |
015-02475 | 6/2/1993 | Casing/tubing pressure passed | |
015-02475 | 10/12/1992 | Casing/tubing pressure passed | |
015-02493 | 6/6/2011 | Annulus method passed | |
015-02497 | 6/6/2011 | Annulus method passed | |
015-02497 | 8/9/1995 | Other passed | |
015-02498 | 8/10/2011 | Annulus pressure passed | |
015-02498 | 6/15/2011 | Annulus pressure failed | |
015-02498 | 8/10/1995 | Other passed | |
019-00460 | 5/11/2012 | Casing/tubing pressure passed | |
019-00460 | 4/20/2007 | Casing/tubing pressure passed | Gene Smith and Terry urban witnessed test. nitrogen pressure to 1300 psi for 20 minutes. 0 bleed off. |
019-00460 | 1/22/2002 | Casing/tubing pressure passed | |
019-00508 | 1/17/2014 | Annulus pressure passed | |
019-00508 | 10/17/2008 | Annulus method passed | |
019-00510 | 12/23/2010 | Casing/tubing pressure passed | |
019-00510 | 11/8/2006 | Casing/tubing pressure passed | |
019-00510 | 11/16/2001 | Casing/tubing pressure passed | |
019-00510 | 7/11/1996 | Casing/tubing pressure passed | |
039-00644 | 9/30/2014 | Annulus pressure passed | |
039-00644 | 7/22/2009 | Other passed | |
039-00644 | 8/24/1994 | Other passed | |
039-00798 | 6/11/2015 | Casing/tubing pressure passed | |
039-00798 | 12/15/2009 | Other passed | |
039-00798 | 4/4/1994 | Casing/tubing pressure passed | |
039-00798 | 1/14/1994 | Casing/tubing pressure passed | |
039-00798 | 9/16/1993 | Casing/tubing pressure passed | |
039-00798 | 12/30/1992 | Casing/tubing pressure passed | |
039-00798 | 9/30/1992 | Casing/tubing pressure passed | |
039-00798 | 6/10/1992 | Casing/tubing pressure passed | |
039-00798 | 3/4/1992 | Casing/tubing pressure passed | |
039-00798 | 1/2/1992 | Casing/tubing pressure passed | |
039-01838 | 10/22/1998 | Casing/tubing pressure passed | |
039-01838 | 3/19/1993 | Casing/tubing pressure passed | |
039-02210 | 6/17/2015 | Annulus method passed | conducted cement squeeze 6-8-2015 following failure, CBL/VDL shows overall good bond from 4430-5340' |
039-02210 | 7/21/2010 | Annulus method passed | Waited for WR-37 Form for approval |
039-02210 | 9/22/2004 | Annulus method passed | |
039-02210 | 1/10/2002 | Annulus pressure failed | |
039-02210 | 2/15/2001 | Casing/tubing pressure passed | |
039-02210 | 4/10/1997 | Casing/tubing pressure passed | |
039-02210 | 5/14/1992 | Casing/tubing pressure passed | |
039-02262 | 5/3/2013 | Annulus method passed | |
039-02262 | 6/17/2008 | Annulus method passed | |
039-02262 | 8/10/2000 | Casing/tubing pressure passed | |
039-02296 | 10/31/2012 | Annulus pressure passed | |
039-02327 | 5/3/2013 | Annulus method passed | |
039-02327 | 6/17/2008 | Annulus pressure passed | |
039-02327 | 10/26/2001 | Casing/tubing pressure passed | |
039-02327 | 10/10/2001 | Annulus method passed | |
039-02327 | 10/31/1996 | Casing/tubing pressure passed | |
039-02327 | 1/21/1993 | Casing/tubing pressure passed | |
039-02327 | 1/10/1992 | Casing/tubing pressure passed | |
039-02419 | 12/20/2013 | Annulus pressure passed | |
039-02419 | 5/3/2013 | Annulus method failed | |
039-02419 | 6/17/2008 | Annulus pressure passed | |
039-02419 | 9/10/2000 | Casing/tubing pressure passed | |
039-02419 | 9/1/2000 | Casing/tubing pressure passed | |
039-02419 | 7/14/1995 | Casing/tubing pressure passed | |
039-02517 | 2/12/1993 | Casing/tubing pressure passed | |
039-02622 | 8/9/1995 | Casing/tubing pressure passed | |
039-02803 | 6/15/2011 | Casing/tubing pressure passed | |
039-02803 | 8/3/2007 | Casing/tubing pressure passed | |
039-02803 | 2/27/2002 | Annulus pressure passed | |
039-02803 | 8/3/1995 | Casing/tubing pressure passed | |
039-03409 | 2/1/2002 | Casing/tubing pressure passed | |
039-03409 | 9/5/2001 | Annulus method failed | |
039-03409 | 2/15/2001 | Casing/tubing pressure passed | |
039-03409 | 2/17/1995 | Casing/tubing pressure passed | |
039-03409 | 2/11/1993 | Casing/tubing pressure passed | |
039-03409 | 2/14/1992 | Casing/tubing pressure passed | |
039-03409 | 1/30/1992 | Casing/tubing pressure failed | |
039-03754 | 6/9/2011 | Casing/tubing pressure passed | |
039-03754 | 8/3/2007 | Casing/tubing pressure passed | |
039-03754 | 3/20/1998 | Casing/tubing pressure passed | |
039-03759 | 6/25/2010 | Annulus pressure passed | |
039-03759 | 6/4/2009 | Annulus pressure failed | |
039-03911 | 6/19/2008 | Casing/tubing pressure failed | |
039-03911 | 7/25/2002 | Annulus pressure passed | |
039-03911 | 8/7/1997 | Casing/tubing pressure passed | |
039-03911 | 4/20/1992 | Casing/tubing pressure passed | |
039-03912 | 6/19/2008 | Casing/tubing pressure failed | |
039-03912 | 11/15/2001 | Casing/tubing pressure failed | |
039-03912 | 11/3/2001 | Annulus method passed | |
039-03912 | 4/4/2001 | Annulus method passed | |
039-03912 | 4/3/1996 | Casing/tubing pressure passed | |
039-04202 | 4/24/2014 | Annulus pressure passed | |
039-04202 | 4/28/2009 | Annulus pressure passed | |
039-04202 | 3/21/1996 | Casing/tubing pressure passed | |
039-04844 | 5/3/2013 | Annulus method passed | |
039-04844 | 6/17/2008 | Annulus method passed | |
039-04844 | 10/26/2001 | Casing/tubing pressure passed | |
039-04844 | 10/10/2001 | Annulus pressure failed | |
039-04844 | 10/31/1996 | Casing/tubing pressure passed | |
039-04844 | 1/20/1992 | Casing/tubing pressure passed | |
039-04892 | 5/3/2013 | Annulus method passed | |
039-04892 | 6/17/2008 | Annulus pressure passed | |
039-04892 | 3/31/1998 | Casing/tubing pressure passed | |
039-04892 | 6/23/1993 | Casing/tubing pressure passed | |
041-00640 | 10/10/2002 | Casing/tubing pressure passed | |
041-00640 | 5/14/1997 | Casing/tubing pressure passed | |
041-00640 | 4/7/1992 | Casing/tubing pressure passed | |
041-02048 | 2/10/1993 | Casing/tubing pressure passed | |
041-03175 | 5/31/2013 | Casing/tubing pressure passed | |
041-03175 | 3/1/2006 | Casing/tubing pressure passed | pressured tubing to 1960 psi for 20 minutes with 40 psi bleeding off- standing valve |
041-03175 | 1/22/1997 | Casing/tubing pressure passed | |
041-03175 | 11/29/1995 | Casing/tubing pressure passed | |
047-00062 | 8/6/2007 | Annulus method passed | |
047-00062 | 4/11/2007 | Casing/tubing pressure failed | Hole developed in tubing. Rigged up and found hole.Replaced joint of pipe and rerun and reset packer. Conduct MIT |
047-00062 | 2/8/2001 | Casing/tubing pressure passed | |
047-00062 | 5/12/1997 | Casing/tubing pressure passed | |
047-00062 | 11/18/1993 | Casing/tubing pressure passed | |
047-00062 | 11/17/1993 | Annulus pressure failed | |
047-00568 | 12/7/1993 | Casing/tubing pressure passed | |
047-00568 | 11/7/1992 | Casing/tubing pressure passed | |
047-01511 | 8/2/2010 | Casing/tubing pressure passed | |
047-01511 | 12/29/2008 | Casing/tubing pressure passed | |
047-01511 | 6/12/2008 | Casing/tubing pressure failed | |
047-01511 | 8/13/2002 | Casing/tubing pressure passed | |
055-00319 | 10/29/2015 | Casing/tubing pressure passed | Established MIT Procedure see UIC Permit 2D0550319 Attachment 3 for specific procedure details. |
055-00319 | 1/1/2010 | Annulus method passed | |
061-00306 | 10/6/2006 | Annulus pressure passed | |
061-00306 | 9/15/1997 | Casing/tubing pressure passed | |
061-00306 | 9/20/1995 | Casing/tubing pressure passed | |
061-00306 | 7/22/1995 | Annulus pressure failed | |
061-00306 | 1/23/1992 | Casing/tubing pressure passed | |
061-00317 | 7/26/2010 | Casing/tubing pressure passed | |
061-00317 | 10/10/2008 | Casing/tubing pressure passed | |
061-00317 | 12/4/2006 | Casing/tubing pressure failed | |
073-02523 | 12/29/2011 | Annulus pressure passed | |
073-02523 | 3/3/2011 | Annulus pressure passed | |
073-02540 | 4/17/2015 | Annulus method passed | Pressure test was conducted and witnessed by inspector Joe Taylor and Mike Goff. intital pressure: 3678 psi and dropped to 3668psi after 20 minutes, >1% bleed |
073-02540 | 5/1/2012 | Annulus pressure passed | |
079-01452 | 1/28/2014 | Annulus method passed | |
081-00281 | 1/17/2014 | Annulus pressure passed | |
081-00281 | 7/22/2009 | Other passed | |
081-00281 | 4/15/1996 | Annulus pressure passed | |
085-05076 | 1/26/2009 | Annulus pressure passed | |
085-05076 | 1/16/2001 | Casing/tubing pressure passed | |
085-05151 | 11/7/2014 | Annulus pressure passed | Submitted CBL log shows cement 100' above injection at ~2380', injection interval 2925'-2929', However VDL log shows potential poor bond above and below injection interval - microannulus(?) |
085-05151 | 11/22/2010 | Other passed | Pipeline tightness test |
085-05151 | 6/9/2009 | Annulus pressure passed | |
085-07569 | 2/15/1997 | Annulus pressure passed | |
085-07652 | 5/23/2008 | Annulus method passed | |
085-07652 | 5/10/2002 | Annulus method passed | |
085-07652 | 3/20/1996 | Casing/tubing pressure passed | |
085-08350 | 4/7/2010 | Annulus pressure passed | |
085-08350 | 5/10/2002 | Annulus method passed | |
085-08350 | 1/30/1996 | Other passed | |
085-09669 | 3/15/2010 | Annulus pressure passed | |
085-09721 | 4/12/2012 | Annulus pressure passed | |
085-09909 | 3/20/2013 | Annulus pressure passed | WR-40 Accumulated Volume Adjusted 12-2015 |
085-10142 | 2/25/2015 | Annulus method passed | 1900 psi was held with minimal bleed off |
087-00257 | 9/1/1998 | Casing/tubing pressure passed | |
087-00257 | 4/15/1992 | Casing/tubing pressure passed | |
087-00599 | 5/22/1996 | Casing/tubing pressure passed | |
087-00658 | 8/26/1997 | Casing/tubing pressure passed | |
087-00658 | 1/15/1992 | Casing/tubing pressure passed | |
087-00701 | 7/27/1998 | Casing/tubing pressure passed | |
087-00701 | 1/12/1993 | Casing/tubing pressure passed | |
087-00985 | 10/9/2013 | Annulus method passed | |
087-00985 | 9/2/2008 | Annulus pressure passed | |
087-00985 | 1/31/1994 | Casing/tubing pressure passed | |
087-01056 | 4/9/2014 | Casing/tubing pressure passed | |
087-01056 | 5/7/2009 | Casing/tubing pressure passed | |
087-01056 | 12/13/2002 | Casing/tubing pressure passed | |
087-01056 | 9/15/1997 | Casing/tubing pressure passed | |
087-01056 | 1/6/1992 | Casing/tubing pressure passed | |
087-01106 | 5/16/2012 | Casing/tubing pressure passed | |
087-01106 | 8/31/2006 | Casing/tubing pressure failed | |
087-01106 | 8/30/2006 | Casing/tubing pressure passed | |
087-01106 | 12/5/2000 | Casing/tubing pressure passed | |
087-01106 | 8/15/1995 | Casing/tubing pressure passed | |
087-01212 | 6/18/2013 | Other passed | |
087-01212 | 5/21/2008 | Other passed | |
087-01212 | 4/27/1995 | Other passed | |
087-01508 | 2/9/2009 | Casing/tubing pressure passed | |
087-01508 | 8/26/1997 | Casing/tubing pressure passed | |
087-01508 | 8/13/1992 | Casing/tubing pressure passed | |
087-01537 | 8/26/1997 | Casing/tubing pressure passed | |
087-01537 | 1/15/1992 | Casing/tubing pressure passed | |
087-01572 | 12/14/1995 | Annulus pressure passed | |
087-01578 | 4/21/1998 | Other passed | |
087-01578 | 2/3/1993 | Annulus pressure passed | |
087-01591 | 2/10/2009 | Casing/tubing pressure passed | |
087-01591 | 8/26/1997 | Casing/tubing pressure passed | |
087-01591 | 1/15/1992 | Casing/tubing pressure passed | |
087-01618 | 8/19/2014 | Casing/tubing pressure passed | MIT witnessed by inspector Ed Gainer |
087-01618 | 2/10/2009 | Casing/tubing pressure passed | |
087-01618 | 1/23/1997 | Casing/tubing pressure passed | |
087-01623 | 3/19/2014 | Annulus pressure passed | |
087-01623 | 10/3/2008 | Casing/tubing pressure passed | |
087-01623 | 9/19/1997 | Casing/tubing pressure passed | |
087-01623 | 7/23/1992 | Casing/tubing pressure passed | |
087-01637 | 12/10/2009 | Other passed | |
087-01637 | 4/21/1998 | Other passed | |
087-01637 | 2/3/1993 | Annulus pressure passed | |
087-01698 | 4/8/2009 | Casing/tubing pressure failed | |
087-01698 | 9/13/2001 | Casing/tubing pressure passed | |
087-01723 | 5/22/2013 | Annulus method passed | |
087-01723 | 6/2/2008 | Annulus method passed | |
087-01723 | 8/19/1997 | Casing/tubing pressure passed | |
087-01723 | 8/13/1992 | Casing/tubing pressure passed | |
087-01898 | 10/11/2010 | Other passed | |
087-01898 | 6/24/1998 | Casing/tubing pressure passed | |
087-01898 | 4/4/1995 | Casing/tubing pressure passed | |
087-01926 | 7/21/1994 | Other passed | |
087-01977 | 8/13/2015 | Annulus method passed | |
087-01977 | 7/15/2015 | Annulus method passed | Tubing re-ran with new packer. Joe Taylor witnessed MIT and granted verbal approval to commence. Gene Smith witenssed test and gave approval to operate |
087-01977 | 6/15/2015 | Annulus pressure passed | 6/15/2015 casing lost pressure, issue was diagnosed "as minor leak on the surface gauge line" |
087-01977 | 8/10/2010 | Casing/tubing pressure passed | |
087-01977 | 9/14/2007 | Casing/tubing pressure passed | |
087-01977 | 5/4/2006 | Casing/tubing pressure passed | |
087-01977 | 12/19/2001 | Casing/tubing pressure passed | |
087-01977 | 4/10/2001 | Casing/tubing pressure passed | |
087-01977 | 3/20/2001 | Casing/tubing pressure failed | |
087-01977 | 5/15/1997 | Casing/tubing pressure passed | |
087-01977 | 3/18/1992 | Casing/tubing pressure passed | |
087-02003 | 10/17/2013 | Annulus pressure passed | |
087-02003 | 8/20/2009 | Other passed | |
087-02003 | 4/19/2001 | Annulus method passed | |
087-02003 | 4/17/2001 | Annulus pressure failed | Developed leak on tubing annulus. Replaced tubing and set new packer. Loaded with fresh water and plan to pressure test. |
087-02003 | 1/16/1997 | Casing/tubing pressure passed | |
087-02075 | 7/27/1999 | Other passed | |
087-02076 | 10/19/1992 | Casing/tubing pressure passed | |
087-02088 | 8/4/1999 | Annulus pressure passed | |
087-02092 | 8/4/1999 | Annulus method passed | |
087-02099 | 8/4/1999 | Annulus method passed | |
087-02101 | 5/18/1999 | Other passed | |
087-02102 | 8/4/1999 | Other passed | |
087-02103 | 5/18/1999 | Other passed | |
087-02103 | 7/23/1992 | Casing/tubing pressure passed | |
087-02103 | 7/16/1992 | Casing/tubing pressure failed | |
087-02106 | 5/18/1999 | Other passed | |
087-02107 | 5/19/1999 | Other passed | |
087-02402 | 5/19/1999 | Other passed | |
087-02404 | 5/19/1999 | Other passed | |
087-02405 | 11/18/1999 | Annulus method passed | |
087-02406 | 9/3/1998 | Other passed | |
087-02407 | 5/28/1998 | Casing/tubing pressure passed | |
087-02408 | 11/18/1999 | Annulus method passed | |
087-02409 | 5/20/1998 | Casing/tubing pressure passed | |
087-02410 | 8/4/1999 | Other passed | |
087-02411 | 3/29/1998 | Casing/tubing pressure passed | |
087-02446 | 4/20/1995 | Annulus pressure failed | |
087-02446 | 2/16/1995 | Annulus pressure failed | |
087-02490 | 5/22/1996 | Casing/tubing pressure passed | |
087-02554 | 9/3/1998 | Other passed | |
087-02554 | 4/24/1992 | Annulus pressure passed | |
087-02638 | 11/17/1999 | Annulus method passed | |
087-02638 | 12/6/1993 | Casing/tubing pressure passed | |
087-02778 | 11/4/1999 | Annulus method passed | |
087-02844 | 11/18/1999 | Annulus method passed | |
087-02941 | 7/24/1998 | Casing/tubing pressure passed | |
087-02941 | 4/10/1992 | Casing/tubing pressure passed | |
087-02942 | 5/19/1999 | Other passed | |
087-02969 | 4/9/1994 | Annulus pressure passed | |
087-02975 | 10/3/2014 | Casing/tubing pressure passed | |
087-02975 | 10/15/2009 | Casing/tubing pressure passed | |
087-02976 | 11/2/1994 | Casing/tubing pressure passed | |
087-03096 | 9/23/1992 | Casing/tubing pressure passed | |
087-03129 | 7/7/1998 | Casing/tubing pressure passed | |
087-03146 | 10/28/1999 | Annulus method passed | |
087-03146 | 8/26/1993 | Casing/tubing pressure passed | |
087-03146 | 12/25/1992 | Annulus pressure failed | |
087-03146 | 12/16/1992 | Casing/tubing pressure passed | |
087-03324 | 5/19/1999 | Other passed | |
087-03334 | 6/10/2008 | Casing/tubing pressure passed | |
087-03334 | 7/8/1996 | Casing/tubing pressure passed | |
087-03348 | 6/30/2014 | Casing/tubing pressure passed | |
087-03348 | 7/17/2007 | Casing/tubing pressure passed | |
087-03348 | 7/24/1996 | Casing/tubing pressure passed | |
087-03349 | 11/2/2007 | Casing/tubing pressure passed | |
087-03349 | 7/25/1996 | Casing/tubing pressure passed | |
087-03398 | 8/26/1998 | Casing/tubing pressure passed | |
087-03398 | 4/6/1992 | Casing/tubing pressure passed | |
087-03399 | 5/21/1999 | Other passed | |
087-03400 | 5/19/1999 | Other passed | |
087-03401 | 5/19/1999 | Other passed | |
087-03407 | 5/19/1999 | Other passed | |
087-03409 | 7/10/1996 | Casing/tubing pressure passed | |
087-03410 | 5/21/1999 | Other passed | |
087-03411 | 5/20/1999 | Other passed | |
087-03412 | 5/20/1999 | Other passed | |
087-03413 | 5/20/1999 | Other passed | |
087-03414 | 5/20/1999 | Other passed | |
087-03414 | 6/28/1994 | Annulus pressure failed | |
087-03416 | 5/20/1999 | Other passed | |
087-03432 | 10/9/2013 | Annulus pressure passed | |
087-03432 | 9/9/2013 | Annulus pressure failed | |
087-03432 | 7/3/2008 | Casing/tubing pressure passed | |
087-03432 | 10/31/2001 | Annulus method passed | |
087-03432 | 9/18/2001 | Annulus pressure failed | |
087-03432 | 8/28/1996 | Casing/tubing pressure passed | |
087-03436 | 6/19/2014 | Casing/tubing pressure passed | |
087-03436 | 1/25/2007 | Casing/tubing pressure passed | |
087-03436 | 7/29/1996 | Casing/tubing pressure passed | |
087-03438 | 8/25/1995 | Casing/tubing pressure passed | |
087-03447 | 9/30/2008 | Casing/tubing pressure passed | |
087-03447 | 8/14/1996 | Casing/tubing pressure passed | |
087-03457 | 10/16/2007 | Annulus pressure passed | |
087-03457 | 7/23/1996 | Casing/tubing pressure passed | |
087-03589 | 12/10/1993 | Casing/tubing pressure passed | |
087-03589 | 10/13/1993 | Annulus pressure failed | |
087-03589 | 10/11/1993 | Annulus pressure failed | |
087-03591 | 7/19/1994 | Casing/tubing pressure passed | |
087-03591 | 6/7/1994 | Annulus pressure failed | |
087-03592 | 8/19/2008 | Casing/tubing pressure passed | |
087-03593 | 11/14/2008 | Casing/tubing pressure passed | |
087-03595 | 3/15/2007 | Casing/tubing pressure passed | |
087-03595 | 4/1/1998 | Annulus pressure failed | |
087-03604 | 10/25/1995 | Other passed | |
087-03605 | 12/15/1995 | Other passed | |
087-03608 | 12/1/1995 | Other passed | |
087-03609 | 11/3/1999 | Annulus method passed | |
087-03630 | 3/29/2007 | Casing/tubing pressure passed | Ran 2 3/8" tubing with Baker tension packer set at 2363' and pressured to 1510 psi for 30 minutes. |
087-03630 | 8/14/1998 | Annulus pressure failed | |
087-03631 | 6/19/2014 | Casing/tubing pressure passed | |
087-03631 | 6/18/2008 | Casing/tubing pressure passed | |
087-03632 | 7/9/2014 | Casing/tubing pressure passed | |
087-03632 | 7/7/2008 | Casing/tubing pressure passed | |
087-03634 | 6/30/2014 | Casing/tubing pressure passed | |
087-03634 | 6/30/2007 | Casing/tubing pressure passed | |
087-03634 | 11/2/1994 | Casing/tubing pressure passed | |
087-03634 | 6/7/1994 | Annulus pressure failed | |
087-03634 | 5/6/1994 | Casing/tubing pressure passed | |
087-03634 | 3/10/1994 | Annulus pressure failed | |
087-03634 | 11/29/1993 | Casing/tubing pressure passed | |
087-03634 | 10/25/1993 | Annulus pressure failed | |
087-03634 | 10/7/1993 | Annulus pressure failed | |
087-03634 | 5/12/1993 | Casing/tubing pressure passed | |
087-03635 | 1/11/2007 | Casing/tubing pressure passed | |
087-03635 | 6/19/1992 | Annulus pressure passed | |
087-03651 | 7/19/2014 | Casing/tubing pressure passed | |
087-03651 | 12/11/2006 | Casing/tubing pressure passed | |
087-03659 | 11/17/1999 | Annulus method passed | |
087-03660 | 11/17/1999 | Annulus method passed | |
087-03661 | 9/3/1998 | Other passed | |
087-03662 | 9/3/1998 | Other passed | |
087-03664 | 11/3/1999 | Annulus method passed | |
087-03674 | 9/4/1998 | Other passed | |
087-03674 | 8/25/1994 | Annulus pressure failed | |
087-03675 | 5/14/1998 | Other passed | |
087-03675 | 5/19/1993 | Casing/tubing pressure passed | |
087-03675 | 4/21/1993 | Annulus pressure failed | |
087-03764 | 7/3/2014 | Casing/tubing pressure passed | |
087-03764 | 10/26/2007 | Casing/tubing pressure passed | |
087-03766 | 11/3/1999 | Annulus method passed | |
087-03767 | 11/4/1999 | Annulus method passed | |
087-03768 | 11/4/1999 | Annulus method passed | |
087-03769 | 11/4/1999 | Annulus method passed | |
087-03771 | 6/24/1998 | Casing/tubing pressure passed | |
087-03771 | 4/23/1992 | Annulus pressure passed | |
087-03772 | 11/4/1999 | Annulus method passed | |
087-03773 | 11/4/1999 | Annulus method passed | |
087-03774 | 3/27/2012 | Annulus pressure passed | |
087-03774 | 10/2/1995 | Casing/tubing pressure passed | |
087-03775 | 11/17/1999 | Annulus method passed | |
087-03776 | 11/4/1999 | Annulus method passed | |
087-03778 | 1/10/2000 | Annulus method passed | |
087-03778 | 6/26/1992 | Casing/tubing pressure passed | |
087-03778 | 1/22/1992 | Annulus pressure failed | |
087-03779 | 7/15/1998 | Casing/tubing pressure passed | |
087-03779 | 4/23/1992 | Annulus pressure passed | |
087-03780 | 9/4/1998 | Other passed | |
087-03781 | 10/3/1995 | Casing/tubing pressure passed | |
087-03875 | 11/17/1999 | Annulus method passed | |
087-03875 | 11/8/1994 | Casing/tubing pressure passed | |
087-03876 | 3/15/1995 | Casing/tubing pressure passed | |
087-03877 | 11/3/1999 | Annulus method passed | |
087-03878 | 1/10/2000 | Annulus method passed | |
087-03878 | 12/6/1994 | Casing/tubing pressure passed | |
087-03879 | 9/4/1998 | Other passed | |
087-03880 | 4/5/2012 | Annulus pressure passed | |
087-03880 | 3/16/1995 | Casing/tubing pressure passed | |
087-03884 | 3/14/1995 | Casing/tubing pressure passed | |
087-03885 | 10/28/1999 | Annulus method passed | |
087-03885 | 12/28/1994 | Casing/tubing pressure passed | |
087-03887 | 7/7/2014 | Casing/tubing pressure passed | |
087-03887 | 5/21/2007 | Casing/tubing pressure passed | |
087-03887 | 4/18/1994 | Casing/tubing pressure passed | |
087-03887 | 6/19/1992 | Annulus pressure passed | |
087-03888 | 7/15/2014 | Casing/tubing pressure passed | |
087-03888 | 5/30/2007 | Casing/tubing pressure passed | |
087-03888 | 8/2/1994 | Casing/tubing pressure passed | |
087-03889 | 8/1/2007 | Casing/tubing pressure passed | |
087-03889 | 7/28/1994 | Casing/tubing pressure passed | |
087-03890 | 5/8/2007 | Casing/tubing pressure passed | |
087-03890 | 1/8/1998 | Annulus pressure failed | |
087-03890 | 7/29/1994 | Casing/tubing pressure passed | |
087-03910 | 6/19/2014 | Casing/tubing pressure passed | |
087-03910 | 6/12/2008 | Casing/tubing pressure passed | |
087-03910 | 7/26/1994 | Casing/tubing pressure passed | |
087-03974 | 1/6/2000 | Casing/tubing pressure passed | |
087-03974 | 3/25/1994 | Other passed | |
087-03976 | 1/11/2000 | Casing/tubing pressure passed | |
087-03976 | 3/25/1994 | Other passed | |
087-03977 | 3/17/1995 | Casing/tubing pressure passed | |
087-03978 | 7/7/2014 | Casing/tubing pressure passed | |
087-03978 | 7/12/2007 | Casing/tubing pressure passed | |
087-03978 | 7/11/1996 | Casing/tubing pressure passed | |
087-04013 | 11/17/1999 | Annulus method passed | |
087-04013 | 3/25/1994 | Other passed | |
087-04016 | 8/30/1996 | Casing/tubing pressure passed | |
087-04078 | 1/6/2000 | Casing/tubing pressure passed | |
087-04078 | 10/17/1993 | Annulus pressure passed | |
087-04079 | 9/6/2005 | Annulus method passed | |
087-04079 | 1/6/2000 | Annulus method passed | |
087-04079 | 10/4/1993 | Annulus pressure passed | |
087-04080 | 9/14/2005 | Annulus method passed | |
087-04080 | 1/6/2000 | Annulus pressure passed | |
087-04080 | 10/6/1993 | Annulus pressure passed | |
087-04081 | 10/11/1993 | Annulus pressure passed | |
087-04087 | 1/7/2000 | Annulus method passed | |
087-04087 | 10/20/1993 | Annulus pressure passed | |
087-04089 | 11/8/1993 | Other passed | |
087-04164 | 7/31/1998 | Casing/tubing pressure passed | |
087-04165 | 7/29/1998 | Casing/tubing pressure passed | |
087-04166 | 12/21/1999 | Annulus method passed | |
087-04171 | 9/16/2005 | Annulus method passed | |
087-04171 | 1/6/2000 | Annulus method passed | |
087-04172 | 7/28/1998 | Casing/tubing pressure passed | |
087-04481 | 10/15/2012 | Other passed | |
087-04481 | 10/10/2007 | Casing/tubing pressure passed | |
087-04724 | 7/13/2015 | Annulus method passed | CBL/VDL = good external internal, good overall bond from Big Injun injection zone 2167' to TOC ~850'. Internal integrity tested 4 1/2" x 2 3/8" annulus loss from 1620 psi to 1560 over 20 min ~3.7%, witnessed & approved by Joe Taylor |
087-04745 | 3/17/2015 | Annulus method passed | CBL/VDL log shows good bond over 4.5" casing (TOC=~40'), angle drilled well, perforations:2234-2242 (MD) packer:2115 (MD) |
087-04747 | 3/19/2015 | Annulus method passed | CBL/VDL good over entire 4.5'" casing (TOC ~45'), packer:2404' (MD) perforations: :2524-2532' (MD) |
087-04749 | 5/29/2015 | Annulus method passed | CBL/VDL shows good over entire 4.5" casing (TOC ~40')), angle drilled well, packer:2177.5' (MD), perforation:2284-2292' (MD) |
087-04751 | 6/8/2015 | Annulus method passed | CBL/VDL log shows overall good bond of 4.5" casing from injection formation to TOC (~750"), packer=2340, perforations 2466-2476' (MD) |
087-04753 | 5/21/2015 | Annulus method passed | 4.5" CBL/VDL shows good cement to casing and fomration above injection formation (Big Injun) hole is angle drilled |
087-04754 | 5/21/2015 | Annulus method passed | 4.5" CBL/VDL shows good overall bond above injection formation (Big Injun), hole is angle drilled |
087-04755 | 5/21/2015 | Annulus method passed | 4.5" CBL/VDL shows good overall bond above the injection formation (Big Injun) hole is angle drilled |
087-04756 | 10/14/2015 | Annulus method passed | Pressure test witnessed and signed/approved by inspector Joe Taylor, pressured well to 1650 after 30 minutes pressure drop to 1625 (~1.5%), external integrity verified using CBL/VDL good cement throughtout 4.5 casing frrom to TOC at 119' |
087-04757 | 9/21/2015 | Annulus pressure passed | Pressure test was witnessed and signed by inspector Joe Taylor, pressured well to 1600 psi and dropped just below 1600 psi after 30 minutes (submitted chart difficult to determine actually pressure loss), external was verified using cementing records, how |
087-04758 | 7/28/2015 | Annulus pressure passed | Pressure tested tubing/casing annulus to 1600 psi for 35 min, witnessed and signed approval by Inspector Joe Taylor for internal integrity, external integrity verified by CBL/VDL good bond overall to TOC 43' |
087-04759 | 7/30/2015 | Annulus method passed | Pressure test witnessed and signed by inspector Joe Taylor, pressured well to1650psi with no recognizable pressure loss according to chart. External integrity verified by CBL/VDL with overall good bond (>80%) on 4.5 casing over 2450 to surface (CTS) |
087-04760 | 8/24/2015 | Annulus method passed | Pressure test was witnessed and signed by inspector Joe Taylor, pressured well to 1620 psi for 30 minutes well lost ~20 psi by the end of test, (~1.2% loss). External integrity used cement casing information however a request was sent to operator to submi |
087-04761 | 8/24/2015 | Annulus method passed | Pressure test was wtinessed and signed by inspector Joe Taylor, pressured well to 1620psi for 20 minutes appears have 20 psi by the end of test (~1.1% loss), External integtrity verified using cement records however the applicant was requested to submit t |
087-04762 | 9/21/2015 | Annulus method passed | Pressure test witnessed and signed by inspector Joe Taylor, pressure chart shows 1625 psi and drop to 1600 after 25 mintues, ~1.5% loss. External integrity verfied using CBL/VDL, good bond (>80%) in 4.5 casing from 380" (TOC) to 2450', perforattions 2352 |
087-04763 | 7/13/2015 | Annulus pressure passed | Pressure tested tubing/casing annulus at 1620 psi for 20 minutes, witnessed and signed by inspector Joe Taylor, pressure chart diffifcult to determine actualpressures, relying in inspector approval for internal integrity, external integrity was verified |
087-04764 | 7/13/2015 | Annulus pressure passed | Pressure test witnessed and signed by inspector Joe Taylor, pressured well to 1620 psi for 20 minutes chart appears to show no loss during test (0%), External integrity verified using CBL/VDL bond appears to be very good on 4.5 casing from TD to surface ( |
087-04765 | 7/21/2015 | Annulus method passed | Pressure test was witnessed and signed by inspector Joe Taylor. Pressured well 1600 psi for 35 minutes pressure chart shows zero pressure loss (0%), External integrity verified by CBL/VDL of 4.5 casing, good bopnd from 2200' to 68' (TOC) |
087-04766 | 8/11/2015 | Annulus pressure passed | Pressure test tubing/casing annulus to 1620 for 25 min, witnessed and signed for approcal by inspector Joe Taylor for internal integrity, external integrity was verified using CBL/VDL shows overall good bond to TOC surface |
087-04767 | 7/21/2015 | Annulus pressure passed | Pressure tested tubing/casing annulus to 1600 psi for 35 min, witnessed and signed approval by inspector Joe Taylor for internal integrity. external integrity was verified using CBL/VDL with good bond overall to TOC 53' |
087-04768 | 8/14/2015 | Annulus method passed | Pressure test witnessed and signed/approved by inspector Joe Taylor, pressured well to 1610 psi with drop 1575 psi after 30 minutes (~2.2 % loss), external integrity verified using CBL/VDL, well shows good cement bond throughout 4.5 casing, TOC ~18' |
087-04780 | 10/16/2015 | Annulus method passed | Pressure test witnessed and signed/approved by inspector Joe Taylor, pressured well 1625 with ~0% loss after 35 minutes, External integtity verified by CBL/VDL good cement good throughout 4.5 casing, appears to be CTS |
087-04781 | 8/11/2015 | Annulus method passed | Pressure test was witnessed and signed by inspector Joe Taylor, pressured well to 1600 for 25 minutes zero psi (0%) loss after test was completed. External integrity was verified using CBL/VDL, good bond throughout 4.5 casing from 110' (TOC) to 2470 |
087-04782 | 8/12/2015 | Annulus method passed | Test was witnessed and signed by inspector Joe Taylor, pressured well to 1600 psi for 30 minutes pressure dropped to 1525 psi (~4.6% loss), external integity verified using CBL/VDL 4.5 casing had good overall cement from 48' (TOC) - 2470' |
093-00081 | 2/10/2012 | Annulus pressure passed | |
093-00081 | 5/18/2004 | Annulus pressure passed | Jamie and Craig witnessed |
093-00103 | 2/2/2012 | Annulus pressure passed | |
093-00103 | 4/2/2008 | Casing/tubing pressure passed | |
097-03422 | 4/20/2015 | Annulus method passed | Tested 2x4 1/2 annulus pressured 1 hour and bled from 1089 to 1074. |
097-03422 | 7/5/2012 | Annulus pressure passed | |
097-03422 | 5/25/2012 | Annulus pressure failed | Tested at 700psi for only 15 minutes. Should be between 810-1080psi for 20 minutes. |
097-03422 | 11/15/2010 | Annulus pressure passed | |
097-03737 | 9/1/2011 | Casing/tubing pressure passed | |
103-00906 | 4/11/2014 | Other passed | |
103-00906 | 4/17/2008 | Casing/tubing pressure passed | |
103-00906 | 5/17/2002 | Monitor record review passed | |
103-00906 | 10/30/1996 | Casing/tubing pressure passed | |
103-00947 | 5/24/2013 | Other passed | |
103-00947 | 3/10/2008 | Casing/tubing pressure passed | |
103-00947 | 5/4/2002 | Monitor record review passed | |
103-00947 | 1/31/1996 | Casing/tubing pressure passed | |
103-00964 | 3/21/2002 | Casing/tubing pressure failed | |
103-00984 | 3/21/2002 | Casing/tubing pressure passed | |
103-00984 | 4/17/1998 | Other passed | |
103-00984 | 6/7/1994 | Annulus pressure failed | |
103-00984 | 2/17/1994 | Casing/tubing pressure passed | |
103-00985 | 10/1/2002 | Monitor record review passed | |
103-00985 | 4/25/1995 | Casing/tubing pressure passed | |
103-00985 | 8/4/1994 | Annulus pressure failed | |
103-00985 | 5/3/1994 | Casing/tubing pressure passed | |
103-00985 | 3/18/1994 | Annulus pressure failed | |
103-00985 | 10/28/1993 | Casing/tubing pressure passed | |
103-00986 | 10/1/2002 | Monitor record review passed | |
103-00986 | 3/30/1994 | Annulus pressure failed | |
103-00986 | 2/23/1994 | Casing/tubing pressure passed | |
103-01171 | 5/19/1997 | Casing/tubing pressure passed | |
103-01288 | 9/28/2000 | Casing/tubing pressure failed | |
103-01315 | 8/24/2010 | Other passed | |
103-01315 | 8/16/2006 | Casing/tubing pressure passed | |
103-01315 | 3/21/2000 | Casing/tubing pressure passed | |
103-01315 | 1/3/2000 | Casing/tubing pressure passed | |
103-01315 | 8/14/1996 | Casing/tubing pressure passed | |
103-01315 | 3/7/1995 | Casing/tubing pressure passed | |
103-01415 | 12/2/2009 | Casing/tubing pressure passed | |
103-01415 | 1/8/1997 | Casing/tubing pressure passed | |
103-01514 | 3/25/2014 | Casing/tubing pressure passed | |
103-01514 | 4/17/2003 | Casing/tubing pressure passed | |
103-01514 | 4/17/1998 | Other passed | |
103-01514 | 10/31/1992 | Casing/tubing pressure passed | |
103-01515 | 6/6/1997 | Casing/tubing pressure passed | |
103-01515 | 11/7/1992 | Casing/tubing pressure passed | |
103-01516 | 3/25/2014 | Casing/tubing pressure passed | |
103-01516 | 10/7/2003 | Casing/tubing pressure passed | |
103-01516 | 4/17/1998 | Other passed | |
103-01516 | 11/14/1992 | Casing/tubing pressure passed | |
103-01530 | 10/2/2002 | Monitor record review passed | |
103-01530 | 6/11/1994 | Annulus pressure failed | |
103-01530 | 5/12/1994 | Casing/tubing pressure passed | |
103-01540 | 5/1/2014 | Casing/tubing pressure passed | |
103-01540 | 6/7/2010 | Casing/tubing pressure passed | |
103-01540 | 1/27/2009 | Casing/tubing pressure failed | |
103-01540 | 7/13/2004 | Casing/tubing pressure passed | |
103-01540 | 8/24/1998 | Other passed | |
103-01540 | 8/30/1993 | Casing/tubing pressure passed | |
103-01541 | 5/9/2003 | Casing/tubing pressure passed | |
103-01541 | 10/20/1998 | Other passed | |
103-01541 | 10/28/1993 | Casing/tubing pressure passed | |
103-01542 | 7/17/2015 | Casing/tubing pressure passed | bridge plug at 2825', pressured to 1775 psi tested 20 min |
103-01542 | 7/15/2010 | Other passed | |
103-01542 | 9/24/2003 | Casing/tubing pressure passed | |
103-01542 | 9/17/1998 | Other passed | |
103-01542 | 9/14/1993 | Casing/tubing pressure passed | |
103-01543 | 7/28/2015 | Casing/tubing pressure passed | retrievable bridge plug set at 3060' pressure at 1700 psi for 20 min, < 5% loss, well was drilled in 1993 meaning it should have tubing and packer arrangement = NOT "grandfathered" |
103-01543 | 7/22/2010 | Other passed | |
103-01543 | 10/21/2003 | Casing/tubing pressure passed | |
103-01543 | 8/8/1998 | Other passed | |
103-01543 | 8/12/1993 | Casing/tubing pressure passed | |
103-01544 | 7/21/2015 | Casing/tubing pressure passed | Bridge plug set at 2795'n, pressure tested at 1800 psi for ~24 min |
103-01544 | 7/15/2010 | Other passed | |
103-01544 | 9/29/2003 | Casing/tubing pressure passed | |
103-01544 | 10/6/1998 | Other passed | |
103-01544 | 10/6/1993 | Casing/tubing pressure passed | |
103-01545 | 7/13/2015 | Casing/tubing pressure passed | retrievable bridge plug at 2700' pressure at 1700 psi, < 5% loss, *well was drilled in 1993 meaning it should have tubing and packer arrangement = NOT "grandfathered" |
103-01545 | 7/6/2010 | Other passed | |
103-01545 | 6/3/2003 | Casing/tubing pressure passed | |
103-01545 | 10/12/1998 | Other passed | |
103-01545 | 10/13/1993 | Casing/tubing pressure passed | |
103-01546 | 7/15/2010 | Other passed | |
103-01546 | 9/26/2003 | Annulus pressure passed | |
103-01546 | 9/14/1998 | Other passed | |
103-01546 | 9/14/1993 | Casing/tubing pressure passed | |
103-01547 | 7/23/2015 | Casing/tubing pressure passed | Bridge plug at 2955', pressure tested 1850 psi for 25 minutes, submitted shart shows 0 loss |
103-01547 | 7/15/2010 | Other passed | |
103-01547 | 9/29/2004 | Casing/tubing pressure passed | |
103-01547 | 9/14/1998 | Other passed | |
103-01565 | 7/9/2009 | Other passed | |
103-01621 | 6/3/2002 | Monitor record review passed | |
103-01625 | 7/24/2015 | Casing/tubing pressure passed | retrievable bridge plug at 2944' pressure at 1700 psi for 20 minutes, < 5% loss, well was drilled 1994 which means it should have a tubing and ;packer arrangement =- NOT "grandfathered" |
103-01625 | 7/22/2010 | Other passed | |
103-01625 | 2/25/2005 | Casing/tubing pressure passed | |
103-01625 | 11/11/1999 | Casing/tubing pressure passed | |
103-01625 | 8/13/1994 | Casing/tubing pressure passed | |
103-01626 | 8/21/2015 | Casing/tubing pressure passed | retrievable bridge plug at 2860' a=pressure at 1700 psi for 20 minutes, < %5 loss, well was drilled 1994 meaning it should have tubing and packer arrangement, = NOT "grandfathered" |
103-01626 | 8/4/2010 | Other passed | |
103-01626 | 2/22/2005 | Casing/tubing pressure failed | |
103-01626 | 11/10/1999 | Casing/tubing pressure failed | |
103-01626 | 8/20/1994 | Casing/tubing pressure passed | |
103-01627 | 2/8/2013 | Other passed | |
103-01627 | 11/29/2007 | Casing/tubing pressure passed | |
103-01627 | 6/5/2002 | Monitor record review passed | |
103-01627 | 8/1/1996 | Annulus pressure passed | |
103-01627 | 8/24/1994 | Casing/tubing pressure passed | |
103-01628 | 4/23/2013 | Other passed | |
103-01628 | 8/4/2010 | Other passed | |
103-01628 | 2/22/2005 | Casing/tubing pressure passed | |
103-01628 | 5/4/2002 | Monitor record review passed | |
103-01628 | 1/1/1999 | Casing/tubing pressure passed | |
103-01628 | 9/15/1994 | Casing/tubing pressure passed | |
103-01631 | 2/5/2013 | Other passed | |
103-01631 | 12/4/2007 | Casing/tubing pressure passed | |
103-01631 | 10/1/2002 | Monitor record review passed | |
103-01631 | 9/15/1994 | Casing/tubing pressure passed | |
103-01632 | 8/4/2010 | Other passed | |
103-01632 | 2/24/2005 | Casing/tubing pressure passed | |
103-01632 | 6/15/2000 | Casing/tubing pressure passed | |
103-01632 | 5/25/1995 | Casing/tubing pressure passed | |
103-01633 | 8/4/2010 | Other passed | |
103-01633 | 2/24/2005 | Casing/tubing pressure passed | |
103-01633 | 8/20/1999 | Other passed | |
103-01633 | 10/10/1994 | Casing/tubing pressure passed | |
103-01634 | 4/24/2014 | Other passed | |
103-01634 | 7/10/2009 | Other passed | |
103-01634 | 7/19/2004 | Casing/tubing pressure passed | |
103-01634 | 8/20/1999 | Other passed | |
103-01634 | 9/15/1994 | Casing/tubing pressure passed | |
103-01635 | 7/22/2010 | Other passed | |
103-01635 | 2/25/2005 | Casing/tubing pressure passed | |
103-01635 | 8/20/1999 | Other passed | |
103-01635 | 8/21/1994 | Casing/tubing pressure passed | |
103-01641 | 3/25/2014 | Casing/tubing pressure passed | |
103-01641 | 1/12/2009 | Annulus method passed | |
103-01641 | 10/3/2002 | Annulus pressure passed | |
103-01641 | 8/1/1996 | Annulus pressure passed | |
103-01641 | 11/13/1994 | Casing/tubing pressure passed | |
103-01642 | 5/29/2014 | Casing/tubing pressure passed | |
103-01642 | 7/2/2009 | Other passed | |
103-01642 | 8/26/2004 | Casing/tubing pressure passed | |
103-01642 | 11/9/1999 | Casing/tubing pressure passed | |
103-01642 | 11/17/1994 | Casing/tubing pressure passed | |
103-01643 | 8/16/2010 | Other passed | |
103-01643 | 2/3/2005 | Casing/tubing pressure passed | |
103-01643 | 8/20/1999 | Other passed | |
103-01643 | 11/18/1994 | Casing/tubing pressure passed | |
103-01644 | 8/30/2013 | Other passed | |
103-01644 | 11/30/2007 | Casing/tubing pressure passed | |
103-01644 | 6/5/2002 | Monitor record review passed | |
103-01644 | 7/26/1996 | Annulus pressure passed | |
103-01644 | 10/12/1994 | Casing/tubing pressure passed | |
103-01645 | 8/16/2010 | Other passed | |
103-01645 | 2/11/2005 | Casing/tubing pressure passed | |
103-01645 | 6/15/2000 | Casing/tubing pressure passed | |
103-01645 | 12/12/1994 | Casing/tubing pressure passed | |
103-01657 | 1/4/2013 | Other passed | |
103-01657 | 12/20/2007 | Casing/tubing pressure passed | |
103-01657 | 10/1/2002 | Monitor record review passed | |
103-01657 | 7/19/1995 | Casing/tubing pressure passed | |
103-01658 | 7/22/2010 | Other passed | |
103-01658 | 2/7/2003 | Annulus method passed | |
103-01658 | 2/22/1996 | Casing/tubing pressure passed | |
103-01659 | 9/9/2013 | Other passed | |
103-01659 | 3/31/2008 | Casing/tubing pressure passed | |
103-01659 | 5/17/2002 | Monitor record review passed | |
103-01659 | 6/17/1996 | Casing/tubing pressure passed | |
103-01660 | 3/26/2014 | Casing/tubing pressure passed | |
103-01660 | 8/16/2006 | Annulus method passed | fluid levels |
103-01660 | 2/8/2001 | Annulus method passed | |
103-01660 | 9/8/1995 | Casing/tubing pressure passed | |
103-01671 | 12/18/2012 | Other passed | |
103-01671 | 5/21/2007 | Casing/tubing pressure passed | |
103-01671 | 4/23/2002 | Monitor record review passed | |
103-01671 | 8/7/1995 | Casing/tubing pressure passed | |
103-01672 | 4/23/2013 | Other passed | |
103-01672 | 5/30/2007 | Casing/tubing pressure passed | |
103-01672 | 4/20/2002 | Monitor record review passed | |
103-01672 | 8/23/1995 | Casing/tubing pressure passed | |
103-01673 | 12/20/2012 | Other passed | |
103-01673 | 5/29/2007 | Casing/tubing pressure passed | |
103-01673 | 7/20/2000 | Monitor record review failed | |
103-01673 | 7/28/1995 | Casing/tubing pressure passed | |
103-01675 | 5/21/2013 | Other passed | |
103-01675 | 1/10/2008 | Casing/tubing pressure passed | |
103-01675 | 10/1/2002 | Monitor record review passed | |
103-01675 | 7/31/1995 | Casing/tubing pressure passed | |
103-01676 | 12/10/2012 | Other passed | |
103-01676 | 4/18/2007 | Casing/tubing pressure passed | set bridge in 4 1/2 " above Gordon perfs and P test to 2150# for 23 minutes |
103-01676 | 4/23/2002 | Monitor record review passed | |
103-01676 | 10/11/1995 | Casing/tubing pressure passed | |
103-01677 | 8/16/2010 | Other passed | |
103-01677 | 2/15/2005 | Casing/tubing pressure passed | |
103-01677 | 9/15/2000 | Casing/tubing pressure passed | |
103-01677 | 6/28/1995 | Casing/tubing pressure passed | |
103-01678 | 5/1/2013 | Other passed | |
103-01678 | 3/13/2008 | Casing/tubing pressure passed | |
103-01678 | 10/1/2002 | Monitor record review passed | |
103-01678 | 8/21/1995 | Casing/tubing pressure passed | |
103-01679 | 8/24/2010 | Other passed | |
103-01679 | 5/4/2002 | Annulus method passed | fluid levels |
103-01679 | 10/12/1995 | Casing/tubing pressure passed | |
103-01685 | 12/19/2012 | Other passed | |
103-01685 | 11/9/2007 | Casing/tubing pressure passed | |
103-01685 | 12/16/2002 | Monitor record review passed | |
103-01685 | 10/8/1996 | Casing/tubing pressure passed | |
103-01688 | 3/26/2014 | Casing/tubing pressure passed | |
103-01688 | 8/16/2006 | Annulus method passed | |
103-01688 | 2/8/2001 | Annulus method passed | |
103-01688 | 8/21/1995 | Casing/tubing pressure passed | |
103-01692 | 12/10/2012 | Other passed | |
103-01692 | 5/31/2007 | Casing/tubing pressure passed | |
103-01692 | 4/23/2002 | Monitor record review passed | |
103-01692 | 8/21/1995 | Casing/tubing pressure passed | |
103-01693 | 12/27/2012 | Other passed | |
103-01693 | 6/7/2007 | Casing/tubing pressure passed | |
103-01693 | 5/20/2002 | Monitor record review passed | |
103-01693 | 6/3/1996 | Casing/tubing pressure passed | |
103-01694 | 6/12/2013 | Other passed | |
103-01694 | 3/16/2008 | Casing/tubing pressure passed | |
103-01694 | 5/4/2002 | Monitor record review passed | |
103-01694 | 6/27/1996 | Casing/tubing pressure passed | |
103-01695 | 1/2/2013 | Other passed | |
103-01695 | 6/7/2007 | Casing/tubing pressure passed | |
103-01695 | 7/23/2002 | Monitor record review passed | |
103-01695 | 6/9/1996 | Casing/tubing pressure passed | |
103-01696 | 4/29/2013 | Other passed | |
103-01696 | 3/16/2008 | Casing/tubing pressure passed | |
103-01696 | 10/2/2002 | Monitor record review passed | |
103-01696 | 6/27/1996 | Casing/tubing pressure passed | |
103-01699 | 8/7/2013 | Other passed | |
103-01699 | 6/4/2007 | Casing/tubing pressure passed | |
103-01699 | 10/17/2002 | Monitor record review passed | |
103-01699 | 7/13/1996 | Monitor record review passed | |
103-01702 | 4/29/2013 | Other passed | |
103-01702 | 6/4/2007 | Casing/tubing pressure passed | |
103-01702 | 10/9/2002 | Monitor record review passed | |
103-01702 | 7/8/1996 | Monitor record review passed | |
103-01704 | 11/28/2012 | Other passed | |
103-01704 | 11/8/2007 | Casing/tubing pressure passed | |
103-01704 | 12/16/2002 | Monitor record review passed | |
103-01704 | 11/9/1996 | Casing/tubing pressure passed | |
103-01705 | 12/19/2012 | Other passed | |
103-01705 | 11/14/2007 | Casing/tubing pressure passed | |
103-01705 | 12/14/2002 | Casing/tubing pressure passed | |
103-01705 | 12/18/1996 | Casing/tubing pressure passed | |
103-01706 | 1/4/2013 | Other passed | |
103-01706 | 11/14/2007 | Casing/tubing pressure passed | |
103-01706 | 12/16/2002 | Monitor record review passed | |
103-01706 | 10/3/1996 | Casing/tubing pressure passed | |
103-01707 | 11/29/2012 | Other passed | |
103-01707 | 11/15/2007 | Casing/tubing pressure passed | |
103-01707 | 11/30/2002 | Monitor record review passed | |
103-01708 | 4/2/2013 | Other passed | |
103-01708 | 3/14/2008 | Casing/tubing pressure passed | |
103-01708 | 11/24/2002 | Monitor record review passed | |
103-01708 | 12/3/1996 | Monitor record review passed | |
103-01709 | 3/28/2013 | Other passed | |
103-01709 | 3/16/2008 | Casing/tubing pressure passed | |
103-01709 | 11/27/2002 | Monitor record review passed | |
103-01709 | 11/24/2002 | Monitor record review passed | |
103-01709 | 11/19/1996 | Monitor record review passed | |
103-01710 | 3/20/2008 | Casing/tubing pressure passed | |
103-01710 | 12/5/2002 | Monitor record review passed | |
103-01710 | 12/10/1996 | Casing/tubing pressure passed | |
103-01711 | 3/20/2013 | Other passed | |
103-01711 | 11/9/2007 | Casing/tubing pressure passed | |
103-01711 | 11/30/2002 | Monitor record review passed | |
103-01711 | 10/8/1996 | Casing/tubing pressure passed | |
103-01716 | 3/19/2013 | Other passed | |
103-01716 | 3/24/2008 | Casing/tubing pressure passed | |
103-01716 | 12/2/2002 | Other passed | fluid levels |
103-01716 | 10/22/1996 | Casing/tubing pressure passed | |
103-01717 | 3/22/2013 | Other passed | |
103-01717 | 3/25/2008 | Casing/tubing pressure passed | |
103-01717 | 12/2/2002 | Monitor record review passed | |
103-01717 | 10/16/1996 | Monitor record review passed | |
103-01718 | 11/7/2012 | Other passed | |
103-01718 | 10/25/2007 | Casing/tubing pressure passed | |
103-01718 | 11/20/2002 | Monitor record review passed | |
103-01718 | 12/28/1996 | Casing/tubing pressure passed | |
103-01719 | 11/2/2012 | Other passed | |
103-01719 | 10/23/2007 | Casing/tubing pressure passed | |
103-01719 | 11/20/2002 | Monitor record review passed | |
103-01719 | 1/3/1997 | Casing/tubing pressure passed | |
103-01720 | 11/6/2012 | Other passed | |
103-01720 | 10/23/2007 | Annulus method passed | |
103-01720 | 11/23/2002 | Monitor record review passed | |
103-01720 | 9/22/1997 | Casing/tubing pressure passed | |
103-01721 | 12/3/2012 | Other passed | |
103-01721 | 11/15/2007 | Casing/tubing pressure passed | |
103-01721 | 11/30/2002 | Monitor record review passed | |
103-01721 | 11/16/1996 | Casing/tubing pressure passed | |
103-01739 | 2/27/2014 | Annulus method passed | |
103-01742 | 10/11/2012 | Other passed | |
103-01742 | 10/29/2007 | Casing/tubing pressure passed | |
103-01742 | 11/27/2002 | Monitor record review passed | |
103-01742 | 8/18/1997 | Casing/tubing pressure passed | |
103-01743 | 10/9/2012 | Other passed | |
103-01743 | 10/26/2007 | Casing/tubing pressure passed | |
103-01743 | 11/26/2002 | Monitor record review passed | |
103-01743 | 8/24/1997 | Casing/tubing pressure passed | |
103-01747 | 9/17/2013 | Annulus method passed | |
103-01748 | 11/20/2002 | Monitor record review passed | |
103-01749 | 10/26/2012 | Annulus pressure passed | |
103-01749 | 10/25/2007 | Casing/tubing pressure passed | |
103-01749 | 11/23/2002 | Monitor record review passed | |
103-01749 | 8/28/1997 | Casing/tubing pressure passed | |
103-01777 | 1/17/2013 | Other passed | |
103-01777 | 1/10/2007 | Casing/tubing pressure passed | |
103-01783 | 5/6/2014 | Other passed | |
103-01913 | 4/18/2013 | Other passed | |
103-01950 | 7/14/2003 | Casing/tubing pressure passed | |
103-01970 | 7/15/2010 | Other passed | |
103-01970 | 10/23/2003 | Casing/tubing pressure failed | |
103-02028 | 3/12/2008 | Casing/tubing pressure passed | |
103-02105 | 12/11/2012 | Other passed | |
103-02105 | 10/1/2007 | Casing/tubing pressure passed | |
103-02126 | 12/8/2005 | Casing/tubing pressure passed | |
103-02203 | 1/14/2013 | Other passed | |
103-02203 | 1/10/2007 | Casing/tubing pressure passed | |
103-02205 | 1/16/2013 | Other passed | |
103-02205 | 2/20/2007 | Casing/tubing pressure passed | |
103-02211 | 3/29/2007 | Casing/tubing pressure failed | |
103-02217 | 10/10/2008 | Casing/tubing pressure passed | |
103-02220 | 12/12/2012 | Other passed | |
103-02220 | 3/21/2007 | Casing/tubing pressure passed | |
103-02221 | 12/4/2012 | Other passed | |
103-02221 | 3/27/2007 | Casing/tubing pressure passed | |
103-02222 | 12/4/2012 | Other passed | |
103-02222 | 3/6/2007 | Casing/tubing pressure passed | |
103-02226 | 12/12/2012 | Other passed | |
103-02226 | 4/17/2007 | Casing/tubing pressure passed | |
103-02227 | 12/12/2012 | Other passed | |
103-02227 | 7/19/2007 | Casing/tubing pressure passed | |
103-02228 | 9/23/2014 | Casing/tubing pressure failed | |
103-02228 | 12/5/2012 | Other passed | |
103-02228 | 7/2/2007 | Casing/tubing pressure passed | |
103-02229 | 12/11/2012 | Other passed | |
103-02229 | 7/2/2007 | Casing/tubing pressure passed | |
103-02327 | 5/13/2014 | Other passed | |
103-02327 | 7/20/2009 | Annulus pressure passed | |
103-02341 | 5/14/2014 | Other passed | |
103-02341 | 7/8/2009 | Casing/tubing pressure passed | |
103-02342 | 8/10/2009 | Other passed | |
103-02343 | 9/23/2008 | Casing/tubing pressure passed | |
103-02344 | 12/3/2013 | Other passed | |
103-02344 | 9/25/2008 | Casing/tubing pressure passed | |
103-02353 | 1/7/2010 | Other passed | |
103-02391 | 3/12/2013 | Annulus method passed | |
103-02393 | 7/21/2014 | Casing/tubing pressure passed | |
103-02393 | 8/19/2009 | Annulus method passed | |
103-02505 | 3/1/2013 | Casing/tubing pressure passed | |
103-02505 | 6/8/2012 | Casing/tubing pressure passed | |
103-02724 | 1/13/2014 | Other passed | |
103-02804 | 9/10/2013 | Annulus method passed | |
105-00994 | 11/19/2014 | Annulus method passed | |
105-00994 | 10/12/2009 | Casing/tubing pressure passed | |
105-00994 | 8/24/1995 | Casing/tubing pressure passed | |
107-00616 | 8/21/2013 | Other passed | |
107-00616 | 11/9/2006 | Other passed | |
107-00616 | 6/15/1994 | Other passed | |
107-00649 | 8/21/2013 | Other passed | |
107-00649 | 11/9/2006 | Other passed | |
107-00649 | 6/15/1994 | Other passed | |
107-00655 | 8/21/2013 | Other passed | |
107-00655 | 11/30/2006 | Casing/tubing pressure passed | pressured backside 150 psi for 30 minutes. No pressure loss. |
107-00658 | 8/21/2013 | Other passed | |
107-00658 | 11/9/2006 | Casing/tubing pressure failed | pressured backside to 150 psi for 30 minutes. No bleed off. |
107-00658 | 8/8/1996 | Other passed | |
107-00663 | 8/21/2013 | Other passed | |
107-00663 | 11/9/2006 | Casing/tubing pressure passed | Pressured backside to 150 psi for 30 minutes and bleed off.& |
107-00663 | 8/8/1996 | Other passed | |
107-00739 | 3/28/2014 | Annulus pressure passed | |
107-00739 | 8/5/2008 | Annulus pressure passed | |
107-00739 | 10/22/1993 | Casing/tubing pressure passed | |
109-00632 | 11/27/2001 | Annulus pressure passed | |
109-00980 | 10/1/2014 | Annulus method passed | |
109-00980 | 10/13/1995 | Other passed | |
109-01093 | 3/20/2009 | None | |
109-01093 | 9/19/1996 | Other passed | |
109-01433 | 1/30/2013 | Casing/tubing pressure passed | |
109-01433 | 7/25/2005 | Casing/tubing pressure passed | |
109-02032 | 1/29/2015 | Annulus method passed | Well tested at 1710 psig "with no blled off" |
109-02032 | 1/20/2015 | Annulus method failed | Tested 3x losing ~45 psig/minute, well was then shut-in and emergency cement squeeze was performed, leak was located 2996'-3220', 7.6 bbl of micro matrix was used then drilled out, Inspector Danny Mullins witnessed |
109-02032 | 3/1/2010 | Annulus method passed | |
109-02032 | 2/28/2010 | Annulus pressure failed | |
109-02032 | 12/1/2006 | Annulus method passed | |
109-02032 | 2/9/2003 | Monitor record review passed | |
109-02703 | 7/13/2015 | Casing/tubing pressure failed | MIT failure. Inspector found same pressure on tubing annulus as what was on tubing while injectin fluid. Violation written |
109-02703 | 7/21/2011 | Casing/tubing pressure passed | |
109-02703 | 7/31/2006 | Casing/tubing pressure passed |
Underground Injection Control Class 2 Wells
Introduction to Class 2 Wells in West Virginia
Collected documents and information for a number of Class 2 disposal wells and secondary recovery area permits
Searchable tables for UIC inspections, UIC permitting and MITs based on a copy of the Office of Oil and Gas' online UIC databases made in 2016.
Select wells which present important issues
A UIC well constructed without any cement behind the steel casing strings to protect groundwater.
A commercial UIC well where activity on the site contaminated groundwater.
A UIC well whose use led to earthquakes in the area.
Gas Well Study is the examination of natural gas wells in West Virginia.
Underground Injection Control Class 2 Wells
These wells are used either for the disposal of oil and gas liquid waste or for the enhanced recovery of oil or natural gas.
Gas Well Study Site Visits
Annual reports, environmental assessments, and individual well information.
YouTube Videos
Select videos from the Gas Well Study YouTube channel.
What Happened at Fernow
An investigation into what caused the vegetation death in the land application area after landspraying hydraulic fracture flowback waste.
The Spill at Buckeye Creek
An investigation into a spill from a Marcellus well site into Buckeye Creek in Doddridge county.
The Details
Plunger Lift Technology on Gas Wells
Fluids Brought to the Surface during Production
Plugging a Well
How To Read a Lab Report
Information the Completion Report Provides
Casing and Cementing